Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 03/06 00:00 0.00 391.40 371.35 13.10 03/06 01:00 0.00 391.40 371.42 13.20 03/06 02:00 0.00 391.40 371.35 13.20 03/06 03:00 0.00 391.42 371.37 13.20 03/06 04:00 0.00 391.42 371.36 13.20 03/06 05:00 0.00 391.44 371.39 13.20 03/06 06:00 0.01 391.44 371.41 13.30 03/06 07:00 0.00 391.46 371.42 13.10 03/06 08:00 0.00 391.47 371.39 13.20 03/06 09:00 0.00 391.47 371.39 13.40 03/06 10:00 0.00 391.48 371.38 13.30 03/06 11:00 0.00 391.44 371.38 13.80 03/06 12:00 0.00 391.48 371.31 13.30 03/06 13:00 0.01 391.49 371.41 13.20 03/06 14:00 0.00 391.49 371.51 13.80 03/06 15:00 0.00 391.50 371.47 13.40 03/06 16:00 0.00 391.49 371.48 13.20 03/06 17:00 0.00 391.50 371.54 13.70 03/06 18:00 0.02 391.53 371.50 13.50 03/06 19:00 0.04 391.52 371.46 13.20 03/06 20:00 0.00 391.54 371.41 13.50 03/06 21:00 0.01 391.63 371.36 13.10 03/06 22:00 0.00 391.51 371.65 13.10 03/06 23:00 0.00 391.65 371.80 13.30