Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 02/09 00:00 0.00 391.75 371.25 13.90 02/09 01:00 0.00 391.81 371.18 13.20 02/09 02:00 0.00 391.81 371.21 13.40 02/09 03:00 0.00 391.83 371.23 13.20 02/09 04:00 0.00 391.83 371.36 13.30 02/09 05:00 0.00 391.87 371.32 13.20 02/09 06:00 0.00 391.82 371.41 13.80 02/09 07:00 0.00 391.77 371.44 13.10 02/09 08:00 0.00 391.71 371.88 13.20 02/09 09:00 0.00 391.86 371.71 13.80 02/09 10:00 0.00 391.91 371.86 13.20 02/09 11:00 0.00 391.84 371.92 13.40 02/09 12:00 0.00 391.81 371.93 13.40 02/09 13:00 0.00 391.86 372.01 13.80 02/09 14:00 0.00 391.85 372.18 13.20 02/09 15:00 0.00 391.84 371.91 13.60 02/09 16:00 0.00 391.57 371.98 13.30 02/09 17:00 0.00 391.62 371.04 14.00 02/09 18:00 0.00 391.68 372.13 13.30 02/09 19:00 0.00 391.42 372.73 13.90 02/09 20:00 0.00 391.70 372.43 13.80 02/09 21:00 0.00 391.84 371.88 13.20 02/09 22:00 0.00 391.88 372.29 13.20 02/09 23:00 0.00 391.45 371.91 13.20