Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 11/29 00:00 0.00 391.56 372.22 13.90 11/29 01:00 0.00 391.68 371.40 13.00 11/29 02:00 0.00 391.53 371.78 13.30 11/29 03:00 0.00 391.57 371.59 13.60 11/29 04:00 0.00 391.60 371.64 13.60 11/29 05:00 0.00 391.60 371.58 13.10 11/29 06:00 0.00 391.54 371.40 13.60 11/29 07:00 0.00 391.59 371.27 13.00 11/29 08:00 0.00 391.55 366.48 13.20 11/29 09:00 0.00 391.37 371.72 13.20 11/29 10:00 0.00 391.68 371.90 12.90 11/29 11:00 0.00 391.73 372.01 13.10 11/29 12:00 0.00 391.69 371.84 12.70 11/29 13:00 0.00 391.67 371.97 13.50 11/29 14:00 0.00 391.55 371.53 12.90 11/29 15:00 0.00 391.45 371.55 12.90 11/29 16:00 0.00 391.47 371.65 12.70 11/29 17:00 0.00 391.43 371.79 13.50 11/29 18:00 0.00 391.42 371.82 12.90 11/29 19:00 0.00 391.38 371.80 13.60 11/29 20:00 0.00 391.40 371.73 13.10 11/29 21:00 0.00 391.61 372.01 13.10 11/29 22:00 0.00 391.55 372.26 13.00 11/29 23:00 0.00 391.72 371.93 13.10