Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 10/29 00:00 0.00 391.74 372.62 13.20 10/29 01:00 0.00 391.76 372.62 13.20 10/29 02:00 0.00 391.79 372.69 13.20 10/29 03:00 0.02 391.82 372.65 13.20 10/29 04:00 0.00 391.83 372.76 13.10 10/29 05:00 0.00 391.90 372.78 13.20 10/29 06:00 0.00 391.72 372.78 13.20 10/29 07:00 0.00 391.67 372.84 13.10 10/29 08:00 0.00 391.86 372.08 13.30 10/29 09:00 0.00 391.68 371.99 13.30 10/29 10:00 0.00 391.68 371.73 13.20 10/29 11:00 0.00 391.73 371.78 13.80 10/29 12:00 0.00 391.63 372.24 13.20 10/29 13:00 0.00 391.50 372.29 13.10 10/29 14:00 0.00 391.77 372.25 13.10 10/29 15:00 0.00 391.83 372.21 13.70 10/29 16:00 0.00 391.74 372.13 13.30 10/29 17:00 0.00 391.77 371.88 13.10 10/29 18:00 0.00 391.84 372.17 13.30 10/29 19:00 0.00 391.79 372.40 13.50 10/29 20:00 0.00 391.78 372.41 13.30 10/29 21:00 0.00 391.75 372.44 13.30 10/29 22:00 0.00 391.74 372.45 13.80 10/29 23:00 0.00 391.73 372.47 13.20