Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 10/22 00:00 0.00 391.76 372.31 13.30 10/22 01:00 0.00 391.55 372.29 13.40 10/22 02:00 0.00 391.58 372.23 13.20 10/22 03:00 0.00 391.66 372.31 13.30 10/22 04:00 0.00 391.64 372.17 13.30 10/22 05:00 0.00 391.62 372.11 13.50 10/22 06:00 0.00 391.63 372.08 13.30 10/22 07:00 0.00 391.66 372.09 13.40 10/22 08:00 0.00 391.63 372.01 13.80 10/22 09:00 0.00 391.76 371.95 ---- 10/22 10:00 0.00 391.66 372.43 9.50 10/22 11:00 0.00 391.55 372.28 13.60 10/22 12:00 0.00 391.58 371.88 13.80 10/22 13:00 0.00 391.57 366.73 13.70 10/22 14:00 0.00 391.55 371.59 13.20 10/22 15:00 0.00 391.54 371.80 13.20 10/22 16:00 0.00 391.55 371.79 13.30 10/22 17:00 0.00 391.58 371.77 13.50 10/22 18:00 0.00 391.66 366.96 13.20 10/22 19:00 0.00 391.59 372.19 13.70 10/22 20:00 0.00 391.60 372.13 13.30 10/22 21:00 0.00 391.65 371.68 13.10 10/22 22:00 0.00 391.60 371.53 13.20 10/22 23:00 0.00 391.46 371.51 13.40