Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 10/10 00:00 0.00 391.20 372.00 13.30 10/10 01:00 0.00 391.35 372.11 13.60 10/10 02:00 0.00 391.17 372.04 13.20 10/10 03:00 0.00 391.18 371.61 13.20 10/10 04:00 0.00 391.08 371.32 13.40 10/10 05:00 0.00 391.31 371.96 13.80 10/10 06:00 0.00 391.18 372.08 13.20 10/10 07:00 0.00 391.19 371.97 13.80 10/10 08:00 0.00 391.24 371.83 13.20 10/10 09:00 0.00 391.24 371.82 13.20 10/10 10:00 0.00 391.17 371.97 13.70 10/10 11:00 0.00 391.25 371.93 13.20 10/10 12:00 0.00 391.24 371.82 13.70 10/10 13:00 0.00 391.21 371.83 13.10 10/10 14:00 0.00 391.19 371.29 13.20 10/10 15:00 0.00 391.22 371.90 13.20 10/10 16:00 0.00 391.22 371.68 13.20 10/10 17:00 0.00 391.44 371.93 13.20 10/10 18:00 0.00 391.59 372.32 13.10 10/10 19:00 0.00 391.75 372.40 13.30 10/10 20:00 0.00 391.83 372.41 13.20 10/10 21:00 0.00 391.82 370.79 13.30 10/10 22:00 0.00 391.71 371.64 13.40 10/10 23:00 0.00 391.62 371.37 13.70