Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 10/05 00:00 0.00 391.65 371.29 13.10 10/05 01:00 0.00 391.68 372.14 13.10 10/05 02:00 0.00 391.82 371.74 13.10 10/05 03:00 0.00 391.79 371.65 13.30 10/05 04:00 0.00 391.55 371.82 13.70 10/05 05:00 0.00 391.61 371.86 13.30 10/05 06:00 0.00 391.76 371.87 13.50 10/05 07:00 0.00 391.66 371.54 13.30 10/05 08:00 0.00 391.60 371.36 13.80 10/05 09:00 0.00 391.70 371.41 13.40 10/05 10:00 0.00 391.65 371.43 13.60 10/05 11:00 0.00 391.65 371.39 13.20 10/05 12:00 0.00 391.61 371.19 13.20 10/05 13:00 0.00 391.58 371.13 13.30 10/05 14:00 0.00 391.45 371.52 13.30 10/05 15:00 0.00 391.33 371.31 13.20 10/05 16:00 0.00 391.57 371.43 13.20 10/05 17:00 0.00 391.77 372.02 13.10 10/05 18:00 0.00 391.76 372.06 13.20 10/05 19:00 0.00 391.80 372.12 13.20 10/05 20:00 0.00 391.85 372.18 14.00 10/05 21:00 0.00 391.76 372.55 13.60 10/05 22:00 0.00 391.89 371.76 13.20 10/05 23:00 0.00 391.83 371.27 13.20