Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 09/30 00:00 0.00 391.74 372.09 13.10 09/30 01:00 0.00 391.73 371.50 13.10 09/30 02:00 0.00 391.48 371.41 13.90 09/30 03:00 0.00 391.60 371.48 13.90 09/30 04:00 0.00 391.53 371.61 12.90 09/30 05:00 0.00 391.56 371.36 13.00 09/30 06:00 0.00 391.52 371.12 13.00 09/30 07:00 0.00 391.58 371.15 13.80 09/30 08:00 0.00 391.53 371.26 13.00 09/30 09:00 0.00 391.55 371.46 13.50 09/30 10:00 0.00 391.52 371.22 13.10 09/30 11:00 0.00 391.58 371.20 13.10 09/30 12:00 0.00 391.52 371.18 12.90 09/30 13:00 0.00 391.53 371.28 13.80 09/30 14:00 0.00 391.54 371.37 13.70 09/30 15:00 0.00 391.55 371.40 13.70 09/30 16:00 0.00 391.47 371.30 13.50 09/30 17:00 0.00 391.61 371.97 13.80 09/30 18:00 0.00 391.84 372.38 13.10 09/30 19:00 0.35 391.92 372.55 13.00 09/30 20:00 0.00 391.80 372.55 13.20 09/30 21:00 0.01 391.75 372.50 13.00 09/30 22:00 0.00 391.71 372.61 13.00 09/30 23:00 0.00 391.74 372.51 13.60