Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 09/15 00:00 0.00 391.45 372.09 13.40 09/15 01:00 0.00 391.44 372.08 13.30 09/15 02:00 0.00 391.45 372.09 13.40 09/15 03:00 0.00 391.45 372.10 13.10 09/15 04:00 0.00 391.42 372.14 13.70 09/15 05:00 0.00 391.40 372.10 13.10 09/15 06:00 0.00 391.40 372.13 13.20 09/15 07:00 0.00 391.35 372.13 13.40 09/15 08:00 0.00 391.38 372.12 13.20 09/15 09:00 0.00 391.32 372.09 13.20 09/15 10:00 0.00 391.32 372.09 13.00 09/15 11:00 0.00 391.30 372.13 13.90 09/15 12:00 0.00 391.26 371.97 13.80 09/15 13:00 0.00 391.22 372.15 13.80 09/15 14:00 0.00 391.21 372.18 13.90 09/15 15:00 0.00 391.24 372.08 13.20 09/15 16:00 0.00 391.24 371.96 13.00 09/15 17:00 0.00 391.22 371.87 12.90 09/15 18:00 0.00 391.25 371.81 13.00 09/15 19:00 0.00 391.39 371.34 13.30 09/15 20:00 0.00 391.31 371.31 13.00 09/15 21:00 0.00 391.29 371.40 13.80 09/15 22:00 0.00 391.35 371.50 13.10 09/15 23:00 0.00 391.40 371.51 13.10