Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 08/26 00:00 0.00 391.67 372.43 13.20 08/26 01:00 0.00 391.80 371.82 13.10 08/26 02:00 0.00 391.84 371.88 13.70 08/26 03:00 0.00 391.72 371.08 13.10 08/26 04:00 0.00 391.41 372.19 13.10 08/26 05:00 0.00 391.60 371.91 13.10 08/26 06:00 0.00 391.63 371.87 13.70 08/26 07:00 0.00 391.54 371.79 13.10 08/26 08:00 0.00 391.51 371.78 13.10 08/26 09:00 0.00 391.62 371.79 13.40 08/26 10:00 0.00 391.59 371.93 13.60 08/26 11:00 0.00 391.54 371.85 13.60 08/26 12:00 0.00 391.56 371.77 13.20 08/26 13:00 0.00 391.61 371.77 13.20 08/26 14:00 0.00 391.56 371.29 13.20 08/26 15:00 0.00 391.35 371.57 13.10 08/26 16:00 0.00 391.71 372.27 13.20 08/26 17:00 0.00 391.71 372.25 13.20 08/26 18:00 0.00 391.66 372.18 13.20 08/26 19:00 0.00 391.54 372.43 13.30 08/26 20:00 0.00 391.55 372.64 13.80 08/26 21:00 0.00 391.57 372.78 13.30 08/26 22:00 0.00 391.55 372.51 13.10 08/26 23:00 0.00 391.50 372.35 13.10