Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 08/19 00:00 0.00 391.91 372.60 13.60 08/19 01:00 0.00 391.93 372.66 13.70 08/19 02:00 0.00 391.89 372.75 13.70 08/19 03:00 0.00 391.68 372.78 13.10 08/19 04:00 0.00 391.69 372.20 13.40 08/19 05:00 0.00 391.62 371.66 13.20 08/19 06:00 0.00 391.47 371.46 13.50 08/19 07:00 0.00 391.52 371.31 13.30 08/19 08:00 0.00 391.62 371.24 13.60 08/19 09:00 0.00 391.48 371.24 13.70 08/19 10:00 0.00 391.49 370.56 13.40 08/19 11:00 0.00 391.54 370.88 13.00 08/19 12:00 0.00 391.84 371.05 13.20 08/19 13:00 0.00 391.65 371.35 13.10 08/19 14:00 0.00 391.78 371.27 13.10 08/19 15:00 0.00 391.87 371.73 13.70 08/19 16:00 0.00 391.92 371.85 13.20 08/19 17:00 0.00 391.92 372.13 13.10 08/19 18:00 0.00 391.91 372.11 13.70 08/19 19:00 0.02 391.92 372.21 13.70 08/19 20:00 0.00 391.92 372.24 13.20 08/19 21:00 0.00 391.92 372.31 13.70 08/19 22:00 0.00 391.92 372.37 13.70 08/19 23:00 0.00 391.92 372.50 13.70