Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 08/09 00:00 0.00 391.73 372.35 13.10 08/09 01:00 0.00 391.74 372.33 13.20 08/09 02:00 0.00 391.74 372.27 13.10 08/09 03:00 0.00 391.76 372.22 13.10 08/09 04:00 0.00 391.75 372.21 13.40 08/09 05:00 0.00 391.80 372.12 13.10 08/09 06:00 0.00 391.81 372.17 13.40 08/09 07:00 0.00 391.76 372.09 13.70 08/09 08:00 0.00 391.85 372.05 13.10 08/09 09:00 0.00 391.81 372.04 13.80 08/09 10:00 0.00 391.80 372.08 13.60 08/09 11:00 0.00 391.81 371.36 13.70 08/09 12:00 0.00 391.76 372.05 13.10 08/09 13:00 0.00 391.73 371.82 13.10 08/09 14:00 0.00 391.70 372.15 13.10 08/09 15:00 0.00 391.72 372.09 13.10 08/09 16:00 0.00 391.69 372.10 13.40 08/09 17:00 0.00 391.69 372.16 13.30 08/09 18:00 0.00 391.66 372.15 ---- 08/09 19:00 0.00 391.66 372.16 9.50 08/09 20:00 0.00 391.64 372.22 13.10 08/09 21:00 0.00 391.62 372.15 13.60 08/09 22:00 0.00 391.47 372.56 13.10 08/09 23:00 0.00 391.43 372.96 13.10