Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 07/25 00:00 0.00 391.78 376.71 13.30 07/25 01:00 0.00 391.75 376.72 13.30 07/25 02:00 0.00 391.80 376.75 13.30 07/25 03:00 0.00 391.76 376.74 13.20 07/25 04:00 0.00 391.76 376.76 13.20 07/25 05:00 0.00 391.77 376.70 13.20 07/25 06:00 0.00 391.77 376.71 13.20 07/25 07:00 0.00 391.83 376.69 13.20 07/25 08:00 0.00 391.82 376.72 13.20 07/25 09:00 0.00 391.81 376.75 13.70 07/25 10:00 0.00 391.83 376.74 13.70 07/25 11:00 0.00 391.98 376.76 13.40 07/25 12:00 0.00 391.84 376.87 13.60 07/25 13:00 0.00 391.84 376.83 13.30 07/25 14:00 0.00 391.83 376.90 13.20 07/25 15:00 0.00 391.81 376.93 13.50 07/25 16:00 0.00 391.72 377.19 13.30 07/25 17:00 0.00 391.69 377.28 13.60 07/25 18:00 0.00 391.67 377.32 13.40 07/25 19:00 0.00 391.68 377.34 13.20 07/25 20:00 0.00 391.68 377.36 13.30 07/25 21:00 0.00 391.69 377.37 13.50 07/25 22:00 0.00 391.70 377.39 13.30 07/25 23:00 0.00 391.62 377.35 13.20