Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 07/23 00:00 0.00 390.11 379.30 13.80 07/23 01:00 0.00 390.16 379.23 13.40 07/23 02:00 0.00 390.15 379.20 13.30 07/23 03:00 0.00 390.15 379.21 ---- 07/23 04:00 0.00 390.15 379.22 13.60 07/23 05:00 0.00 390.14 379.24 13.70 07/23 06:00 0.00 390.14 379.22 13.70 07/23 07:00 0.00 390.16 379.16 13.50 07/23 08:00 0.00 390.15 379.19 13.30 07/23 09:00 0.00 390.13 379.19 13.50 07/23 10:00 0.00 390.15 379.17 13.30 07/23 11:00 0.00 390.15 379.15 13.80 07/23 12:00 0.00 390.14 379.16 13.60 07/23 13:00 0.00 390.11 379.16 13.30 07/23 14:00 0.00 390.27 378.84 13.40 07/23 15:00 0.00 390.40 378.62 13.30 07/23 16:00 0.00 390.58 378.12 13.20 07/23 17:00 0.00 390.75 377.79 13.60 07/23 18:00 0.00 390.87 377.59 13.30 07/23 19:00 0.00 390.97 377.44 13.80 07/23 20:00 0.00 391.07 377.33 13.30 07/23 21:00 0.00 391.15 377.26 13.50 07/23 22:00 0.00 391.25 377.22 13.30 07/23 23:00 0.00 391.33 377.18 13.30