Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 07/05 00:00 0.00 389.75 385.59 13.30 07/05 01:00 0.00 389.84 385.70 13.20 07/05 02:00 0.00 389.66 385.98 13.20 07/05 03:00 0.00 389.50 386.25 13.90 07/05 04:00 0.00 389.53 386.28 13.30 07/05 05:00 0.00 389.54 386.31 13.40 07/05 06:00 0.00 389.54 386.37 13.20 07/05 07:00 0.00 389.64 386.41 13.30 07/05 08:00 0.00 389.51 386.60 13.30 07/05 09:00 0.00 389.47 386.64 13.40 07/05 10:00 0.00 389.44 386.63 13.50 07/05 11:00 0.00 389.44 386.63 13.40 07/05 12:00 0.00 389.45 386.66 13.30 07/05 13:00 0.00 389.49 386.68 13.80 07/05 14:00 0.00 389.40 386.69 13.60 07/05 15:00 0.00 389.46 386.69 13.30 07/05 16:00 0.00 389.43 386.69 13.40 07/05 17:00 0.00 389.44 386.69 13.40 07/05 18:00 0.00 389.42 386.69 13.30 07/05 19:00 0.00 389.42 386.67 13.40 07/05 20:00 0.00 389.43 386.68 13.80 07/05 21:00 0.00 389.42 386.70 13.60 07/05 22:00 0.00 389.40 386.68 13.40 07/05 23:00 0.00 389.37 386.68 13.80