Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 06/30 00:00 0.00 390.25 379.54 13.50 06/30 01:00 0.00 390.16 379.40 13.50 06/30 02:00 0.00 390.15 379.24 13.90 06/30 03:00 0.00 390.11 379.09 13.50 06/30 04:00 0.00 390.27 378.63 13.60 06/30 05:00 0.00 390.48 378.21 13.60 06/30 06:00 0.00 390.63 377.96 13.70 06/30 07:00 0.00 390.74 377.83 13.50 06/30 08:00 0.00 390.64 378.24 13.50 06/30 09:00 0.00 390.30 379.07 13.80 06/30 10:00 0.00 390.07 379.46 13.30 06/30 11:00 0.00 389.94 379.70 13.50 06/30 12:00 0.00 389.99 379.86 13.30 06/30 13:00 0.00 390.11 379.97 13.50 06/30 14:00 0.00 389.58 381.04 13.90 06/30 15:00 0.43 389.43 381.27 13.60 06/30 16:00 0.00 389.37 381.54 13.60 06/30 17:00 0.00 389.42 381.70 14.00 06/30 18:00 0.00 389.58 381.81 13.60 06/30 19:00 0.00 389.81 381.91 13.60 06/30 20:00 0.00 389.62 382.52 13.40 06/30 21:00 0.00 389.63 382.77 13.30 06/30 22:00 0.00 389.66 382.90 13.30 06/30 23:00 0.00 389.78 383.01 13.80