Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 06/23 00:00 0.00 391.59 373.59 13.30 06/23 01:00 0.00 391.60 373.57 13.30 06/23 02:00 0.00 391.62 373.59 13.30 06/23 03:00 0.00 391.64 373.58 13.40 06/23 04:00 0.00 391.67 373.58 13.60 06/23 05:00 0.00 391.71 373.51 13.30 06/23 06:00 0.00 391.70 373.59 13.40 06/23 07:00 0.00 391.72 373.61 13.30 06/23 08:00 0.00 391.69 373.66 13.50 06/23 09:00 0.00 391.72 373.67 13.70 06/23 10:00 0.00 391.72 373.61 13.30 06/23 11:00 0.00 391.73 373.64 13.30 06/23 12:00 0.00 391.73 373.67 13.40 06/23 13:00 0.00 391.67 373.88 13.40 06/23 14:00 0.00 391.67 373.93 13.50 06/23 15:00 0.00 391.69 373.97 13.60 06/23 16:00 0.00 391.69 373.96 13.50 06/23 17:00 0.00 391.71 373.95 13.30 06/23 18:00 0.00 391.72 373.95 13.40 06/23 19:00 0.00 391.72 373.94 13.60 06/23 20:00 0.00 391.72 373.97 13.30 06/23 21:00 0.00 391.74 374.00 13.20 06/23 22:00 0.00 391.76 373.98 13.20 06/23 23:00 0.00 391.76 374.03 13.10