Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 06/17 00:00 0.00 391.49 377.12 13.60 06/17 01:00 0.00 391.54 377.13 13.60 06/17 02:00 0.00 391.58 377.12 13.30 06/17 03:00 0.00 391.57 377.13 13.50 06/17 04:00 0.00 391.55 377.28 13.30 06/17 05:00 0.00 391.52 377.41 13.40 06/17 06:00 0.00 391.47 377.45 13.40 06/17 07:00 0.00 391.46 377.48 13.60 06/17 08:00 0.00 391.41 377.50 13.40 06/17 09:00 0.00 391.39 377.49 13.40 06/17 10:00 0.00 391.36 377.55 13.80 06/17 11:00 0.00 391.33 377.57 13.40 06/17 12:00 0.00 391.36 370.18 13.50 06/17 13:00 0.00 391.39 377.56 13.60 06/17 14:00 0.00 391.43 377.62 13.60 06/17 15:00 0.00 391.49 377.64 13.40 06/17 16:00 0.00 391.52 377.61 13.40 06/17 17:00 0.00 391.55 377.67 13.40 06/17 18:00 0.00 391.61 377.67 13.40 06/17 19:00 0.00 391.64 377.65 13.40 06/17 20:00 0.00 391.66 377.68 13.50 06/17 21:00 0.00 391.71 377.65 13.90 06/17 22:00 0.00 391.66 377.84 13.40 06/17 23:00 0.00 391.65 377.92 13.40