Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 05/17 00:00 0.00 391.45 374.69 13.30 05/17 01:00 0.00 391.45 374.62 13.70 05/17 02:00 0.01 391.51 374.54 13.30 05/17 03:00 0.00 391.48 374.51 13.50 05/17 04:00 0.00 391.49 374.54 13.30 05/17 05:00 0.00 391.50 374.49 13.20 05/17 06:00 0.00 391.51 374.46 13.70 05/17 07:00 0.00 391.48 374.49 13.70 05/17 08:00 0.01 391.47 374.44 13.30 05/17 09:00 0.00 391.46 374.46 13.70 05/17 10:00 0.00 391.47 374.49 13.40 05/17 11:00 0.03 391.45 374.55 13.30 05/17 12:00 0.33 391.36 374.62 13.50 05/17 13:00 0.16 391.40 374.68 13.50 05/17 14:00 0.00 391.35 374.73 13.40 05/17 15:00 0.00 391.34 374.68 13.80 05/17 16:00 0.00 391.31 374.71 13.50 05/17 17:00 0.02 391.28 374.69 13.40 05/17 18:00 0.00 391.35 374.58 13.30 05/17 19:00 0.00 391.33 374.49 13.40 05/17 20:00 0.00 391.35 374.45 13.20 05/17 21:00 0.00 391.38 374.42 13.20 05/17 22:00 0.00 391.41 374.38 13.30 05/17 23:00 0.00 391.41 374.35 13.40