Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 05/14 00:00 0.00 391.40 378.75 13.30 05/14 01:00 0.00 391.39 378.77 13.40 05/14 02:00 0.00 391.37 378.76 13.30 05/14 03:00 0.00 391.36 378.77 13.30 05/14 04:00 0.00 391.31 378.75 13.30 05/14 05:00 0.00 391.32 378.73 13.40 05/14 06:00 0.00 391.32 378.73 13.30 05/14 07:00 0.00 391.30 378.73 13.40 05/14 08:00 0.00 391.29 378.74 13.70 05/14 09:00 0.00 391.28 378.72 13.40 05/14 10:00 0.00 391.27 378.74 13.70 05/14 11:00 0.00 391.54 378.03 13.40 05/14 12:00 0.00 391.65 377.67 13.40 05/14 13:00 0.00 391.71 377.41 13.40 05/14 14:00 0.00 391.79 377.23 13.60 05/14 15:00 0.00 391.84 377.14 13.40 05/14 16:00 0.00 391.78 377.26 13.40 05/14 17:00 0.00 391.74 377.32 13.40 05/14 18:00 0.00 391.70 377.37 13.70 05/14 19:00 0.00 391.66 377.35 13.30 05/14 20:00 0.00 391.61 377.41 13.30 05/14 21:00 0.00 391.57 377.40 13.30 05/14 22:00 0.00 391.58 377.31 13.30 05/14 23:00 0.00 391.57 377.15 13.30