Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 04/16 00:00 0.00 391.55 374.49 13.40 04/16 01:00 0.00 391.55 374.49 13.40 04/16 02:00 0.00 391.54 374.51 13.50 04/16 03:00 0.00 391.53 374.54 13.90 04/16 04:00 0.00 391.55 374.55 13.60 04/16 05:00 0.00 391.55 374.55 13.40 04/16 06:00 0.00 391.55 374.60 13.40 04/16 07:00 0.00 391.53 374.62 13.80 04/16 08:00 0.00 391.53 374.64 13.60 04/16 09:00 0.00 391.51 374.66 13.30 04/16 10:00 0.00 391.52 374.65 13.40 04/16 11:00 0.03 391.51 374.62 13.40 04/16 12:00 0.02 391.64 374.10 13.70 04/16 13:00 0.02 391.62 373.87 13.60 04/16 14:00 0.03 391.67 373.76 13.40 04/16 15:00 0.05 391.68 373.68 13.40 04/16 16:00 0.10 391.73 373.59 13.70 04/16 17:00 0.02 391.73 373.52 13.40 04/16 18:00 0.05 391.76 373.47 13.40 04/16 19:00 0.04 391.77 373.40 13.40 04/16 20:00 0.02 391.79 373.33 13.70 04/16 21:00 0.00 391.81 373.25 13.40 04/16 22:00 0.00 391.82 373.36 13.40 04/16 23:00 0.01 391.82 373.37 13.80