Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 04/05 00:00 0.00 391.89 376.73 13.30 04/05 01:00 0.00 391.92 376.71 13.30 04/05 02:00 0.00 391.86 376.98 13.20 04/05 03:00 0.00 391.75 377.19 13.20 04/05 04:00 0.00 391.75 377.17 13.70 04/05 05:00 0.00 391.72 377.23 13.30 04/05 06:00 0.00 391.67 377.25 13.30 04/05 07:00 0.00 391.72 377.13 13.40 04/05 08:00 0.00 391.70 377.18 13.30 04/05 09:00 0.00 391.71 377.12 13.50 04/05 10:00 0.00 391.60 377.29 13.30 04/05 11:00 0.00 391.67 377.19 13.30 04/05 12:00 0.00 391.67 377.17 13.40 04/05 13:00 0.00 391.50 377.33 13.70 04/05 14:00 0.00 391.55 377.30 13.70 04/05 15:00 0.00 391.54 377.28 13.40 04/05 16:00 0.00 391.55 377.23 13.30 04/05 17:00 0.00 391.55 377.24 13.40 04/05 18:00 0.00 391.53 377.19 13.30 04/05 19:00 0.00 391.52 377.22 13.70 04/05 20:00 0.00 391.52 377.20 13.30 04/05 21:00 0.00 391.55 377.14 13.70 04/05 22:00 0.00 391.52 377.20 13.40 04/05 23:00 0.00 391.51 377.17 13.40