Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 02/06 00:00 0.00 391.88 375.24 13.50 02/06 01:00 0.00 391.87 375.11 13.30 02/06 02:00 0.00 391.86 375.05 13.40 02/06 03:00 0.00 391.85 375.03 13.30 02/06 04:00 0.00 391.85 374.97 13.30 02/06 05:00 0.00 391.86 374.91 13.40 02/06 06:00 0.00 391.86 374.89 13.40 02/06 07:00 0.00 391.86 374.87 13.30 02/06 08:00 0.00 391.81 374.87 13.30 02/06 09:00 0.00 391.84 374.86 13.30 02/06 10:00 0.00 391.82 374.85 13.70 02/06 11:00 0.00 391.73 374.83 13.60 02/06 12:00 0.00 391.68 374.83 13.40 02/06 13:00 0.00 391.58 374.91 13.40 02/06 14:00 0.06 391.61 374.90 13.70 02/06 15:00 0.10 391.56 374.94 13.60 02/06 16:00 0.04 391.74 374.39 13.70 02/06 17:00 0.01 391.79 374.21 13.30 02/06 18:00 0.00 391.74 374.05 13.30 02/06 19:00 0.00 391.73 373.96 13.30 02/06 20:00 0.00 391.73 373.93 13.40 02/06 21:00 0.00 391.73 373.82 13.30 02/06 22:00 0.00 391.75 373.77 13.50 02/06 23:00 0.00 391.79 373.69 13.30