ARBO2: Arbuckle Lake

                                SHEF ID:       ARBO2     Arbuckle Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 872.00, Top = 885.30

PRECIP PRECIP(A) ELEVATION STORAGE INFLOW RELEASEWIND-SPEED VOLTAGE BAT-LOAD
in in ft ac-ft cfs cfs mph volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/27 00:00 0.00 ---- 875.26 80370 158 962 ---- 13.05 12.89
06/27 01:00 0.00 ---- 875.23 80294 158 961 ---- 13.05 12.89
06/27 02:00 0.00 ---- 875.21 80243 157 961 ---- 13.05 12.89
06/27 03:00 0.00 ---- 875.19 80191 157 961 ---- 13.05 12.89
06/27 04:00 0.00 ---- 875.16 80115 157 961 ---- 13.05 12.89
06/27 05:00 0.00 ---- 875.12 80013 95 961 ---- 13.05 12.89
06/27 06:00 0.00 ---- 875.10 79961 33 961 ---- 13.05 12.89
06/27 07:00 0.00 ---- 875.07 79885 33 960 ---- 13.05 12.89
06/27 08:00 0.00 ---- 875.04 79808 96 960 ---- 13.05 12.89
06/27 09:00 0.00 ---- 875.01 79732 161 960 ---- 13.05 12.89
06/27 10:00 0.00 ---- 874.99 79681 165 960 ---- 13.05 12.89
06/27 11:00 0.00 ---- 874.97 79631 230 960 ---- 13.05 12.89
06/27 12:00 0.00 ---- 874.94 79556 234 960 ---- 13.05 12.89
06/27 13:00 0.00 ---- 874.92 79506 235 960 ---- 13.05 12.89
06/27 14:00 0.00 ---- 874.89 79432 175 959 ---- 13.05 12.89
06/27 15:00 0.00 ---- 874.87 79382 174 959 ---- 13.05 12.89
06/27 16:00 0.00 ---- 874.84 79307 235 959 ---- 13.05 12.89
06/27 17:00 0.00 ---- 874.81 79232 234 959 ---- 13.05 12.89
06/27 18:00 0.00 ---- 874.80 79207 174 959 ---- 13.05 12.89
06/27 19:00 0.00 ---- 874.77 79132 234 959 ---- 13.05 12.89
06/27 20:00 0.00 ---- 874.74 79057 234 959 ---- 13.05 12.89
06/27 21:00 0.00 ---- 874.72 79007 174 959 ---- 13.05 12.89
06/27 22:00 0.00 ---- 874.69 78933 113 958 ---- 13.05 12.89
06/27 23:00 0.00 ---- 874.66 78858 ---- ---- ---- 13.05 12.89
Data processed at Sun 28Jun2026 04:03 GMT

NOTICE: If you are parsing this page

Please convert to using our Data API. Starting early 2026 we will be migrating to: https://water.usace.army.mil with modern pages rendered in JavaScript. When this migration completes you will no longer be able to scrape this page! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ARBU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ARBU.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ARBU.Elev.Inst.1Hour.0.Ccp-Rev
ARBU.Stor.Inst.1Hour.0.Ccp-Rev
ARBU.Flow-Res In.Ave.1Hour.1Hour.Rev-Regi-Computed
ARBU.Flow-Res Out.Inst.1Hour.0.Rev-Regi-Flowgroup
ARBU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
ARBU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.