ARBO2: Arbuckle Lake

                                SHEF ID:       ARBO2     Arbuckle Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 872.00, Top = 885.30

PRECIP PRECIP(A) ELEVATION STORAGE INFLOW RELEASEWIND-SPEED VOLTAGE BAT-LOAD
in in ft ac-ft cfs cfs mph volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/24 00:00 0.00 ---- 876.19 82758 2164 331 ---- 13.05 12.89
06/24 01:00 0.00 ---- 876.24 82889 1786 331 ---- 13.05 12.89
06/24 02:00 0.00 ---- 876.28 82993 1470 331 ---- 13.05 12.89
06/24 03:00 0.00 ---- 876.31 83072 1407 331 ---- 13.05 12.89
06/24 04:00 0.00 ---- 876.33 83124 1217 331 ---- 13.05 12.89
06/24 05:00 0.00 ---- 876.36 83202 1091 331 ---- 13.05 12.89
06/24 06:00 0.00 ---- 876.38 83255 1027 331 ---- 13.05 12.89
06/24 07:00 0.00 ---- 876.40 83307 1027 331 ---- 13.05 12.89
06/24 08:00 0.00 ---- 876.42 83359 901 331 ---- 13.05 12.89
06/24 09:00 0.00 ---- 876.44 83412 839 331 ---- 13.05 12.89
06/24 10:00 0.00 ---- 876.45 83438 840 654 ---- 13.05 12.89
06/24 11:00 0.00 ---- 876.45 83438 778 654 ---- 13.05 12.89
06/24 12:00 0.00 ---- 876.46 83464 715 968 ---- 13.05 12.89
06/24 13:00 0.00 ---- 876.45 83438 716 968 ---- 13.05 12.89
06/24 14:00 0.00 ---- 876.44 83412 716 968 ---- 13.05 12.89
06/24 15:00 0.00 ---- 876.43 83386 715 968 ---- 13.05 12.89
06/24 16:00 0.00 ---- 876.42 83359 715 968 ---- 13.05 12.89
06/24 17:00 0.00 ---- 876.42 83359 715 968 ---- 13.05 12.89
06/24 18:00 0.00 ---- 876.41 83333 651 968 ---- 13.05 12.89
06/24 19:00 0.00 ---- 876.40 83307 651 968 ---- 13.05 12.89
06/24 20:00 0.00 ---- 876.38 83255 588 968 ---- 13.05 12.89
06/24 21:00 0.00 ---- 876.37 83229 588 968 ---- 13.05 12.89
06/24 22:00 0.00 ---- 876.36 83202 588 968 ---- 13.05 12.89
06/24 23:00 0.00 ---- 876.33 83124 ---- ---- ---- 13.05 12.89
Data processed at Thu 25Jun2026 04:03 GMT

NOTICE: If you are parsing this page

Please convert to using our Data API. Starting early 2026 we will be migrating to: https://water.usace.army.mil with modern pages rendered in JavaScript. When this migration completes you will no longer be able to scrape this page! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ARBU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ARBU.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ARBU.Elev.Inst.1Hour.0.Ccp-Rev
ARBU.Stor.Inst.1Hour.0.Ccp-Rev
ARBU.Flow-Res In.Ave.1Hour.1Hour.Rev-Regi-Computed
ARBU.Flow-Res Out.Inst.1Hour.0.Rev-Regi-Flowgroup
ARBU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
ARBU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.