ARBO2: Arbuckle Lake

                                SHEF ID:       ARBO2     Arbuckle Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 872.00, Top = 885.30

PRECIP PRECIP(A) ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(America/Chicago)
06/08 00:00 0.00 ---- 877.11 85170 580 1422 13.05 12.97
06/08 01:00 0.00 ---- 877.09 85117 580 1422 13.05 12.97
06/08 02:00 0.00 ---- 877.06 85036 516 1422 13.05 12.97
06/08 03:00 0.00 ---- 877.04 84983 583 1421 13.05 12.97
06/08 04:00 0.00 ---- 877.00 84876 523 1421 13.05 12.97
06/08 05:00 0.00 ---- 876.98 84824 527 1421 13.05 12.97
06/08 06:00 0.00 ---- 876.95 84745 466 1421 13.05 12.97
06/08 07:00 0.00 ---- 876.92 84667 598 1420 13.05 12.97
06/08 08:00 0.00 ---- 876.89 84588 534 1420 13.05 12.97
06/08 09:00 0.00 ---- 876.87 84536 597 1420 13.05 12.97
06/08 10:00 0.00 ---- 876.84 84458 597 1420 13.05 12.97
06/08 11:00 0.00 ---- 876.82 84405 660 1420 13.05 12.97
06/08 12:00 0.00 ---- 876.79 84327 660 1419 13.05 12.97
06/08 13:00 0.00 ---- 876.77 84275 660 1419 13.05 12.97
06/08 14:00 0.00 ---- 876.75 84222 596 1419 13.05 12.97
06/08 15:00 0.00 ---- 876.72 84144 659 1419 13.05 12.97
06/08 16:00 0.00 ---- 876.69 84065 596 1419 13.05 12.97
06/08 17:00 0.00 ---- 876.67 84013 596 1418 13.05 12.97
06/08 18:00 0.00 ---- 876.64 83935 659 1418 13.05 12.97
06/08 19:00 0.00 ---- 876.62 83882 1228 1418 13.05 12.97
06/08 20:00 0.00 ---- 876.60 83830 2114 1418 13.05 12.97
06/08 21:00 0.81 ---- 876.66 83987 2684 1418 13.05 12.97
06/08 22:00 0.14 ---- 876.78 84301 3950 1419 13.05 12.97
06/08 23:00 0.00 ---- 876.94 84719 ---- ---- 13.05 12.97
Data processed at Mon 09Jun2025 04:03 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ARBU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ARBU.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ARBU.Elev.Inst.1Hour.0.Ccp-Rev
ARBU.Stor.Inst.1Hour.0.Ccp-Rev
ARBU.Flow-Res In.Ave.1Hour.1Hour.Rev-Regi-Computed
ARBU.Flow-Res Out.Inst.1Hour.0.Rev-Regi-Flowgroup
ARBU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
ARBU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.