ARBO2: Arbuckle Lake

                                SHEF ID:       ARBO2     Arbuckle Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 872.00, Top = 885.30

PRECIP PRECIP(A) ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(America/Chicago)
05/22 00:00 0.00 ---- 873.36 75653 12 83 13.05 12.97
05/22 01:00 0.00 ---- 873.36 75653 17 83 13.05 12.97
05/22 02:00 0.00 ---- 873.35 75628 12 83 13.05 12.97
05/22 03:00 0.00 ---- 873.35 75628 17 83 13.05 12.97
05/22 04:00 0.00 ---- 873.34 75604 12 83 13.05 12.97
05/22 05:00 0.00 ---- 873.34 75604 18 83 13.05 12.97
05/22 06:00 0.00 ---- 873.33 75580 19 83 13.05 12.97
05/22 07:00 0.00 ---- 873.33 75580 26 83 13.05 12.97
05/22 08:00 0.00 ---- 873.33 75580 28 83 13.05 12.97
05/22 09:00 0.00 ---- 873.33 75580 38 83 13.05 12.97
05/22 10:00 0.00 ---- 873.32 75555 41 83 13.05 12.97
05/22 11:00 0.02 ---- 873.33 75580 47 83 13.05 12.97
05/22 12:00 0.14 ---- 873.32 75555 144 83 13.05 12.97
05/22 13:00 0.06 ---- 873.33 75580 263 83 13.05 12.97
05/22 14:00 0.22 ---- 873.35 75628 253 83 13.05 12.97
05/22 15:00 0.07 ---- 873.37 75677 370 83 13.05 12.97
05/22 16:00 0.07 ---- 873.36 75653 483 83 13.05 12.97
05/22 17:00 0.00 ---- 873.38 75701 506 83 13.05 12.97
05/22 18:00 0.00 ---- 873.40 75750 506 83 13.05 12.97
05/22 19:00 0.00 ---- 873.42 75799 632 83 13.05 12.97
05/22 20:00 ---- ---- ---- ---- ---- ---- 13.05 12.97
05/22 21:00 ---- ---- ---- ---- ---- ---- ---- ----
05/22 22:00 ---- ---- ---- ---- ---- ---- ---- ----
05/22 23:00 ---- ---- ---- ---- ---- ---- ---- ----
Data processed at Fri 23May2025 01:03 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ARBU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ARBU.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ARBU.Elev.Inst.1Hour.0.Ccp-Rev
ARBU.Stor.Inst.1Hour.0.Ccp-Rev
ARBU.Flow-Res In.Ave.1Hour.1Hour.Rev-Regi-Computed
ARBU.Flow-Res Out.Inst.1Hour.0.Rev-Regi-Flowgroup
ARBU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
ARBU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.