ARBO2: Arbuckle Lake

                                SHEF ID:       ARBO2     Arbuckle Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 872.00, Top = 885.30

PRECIP PRECIP(A) ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(America/Chicago)
05/11 00:00 0.00 ---- 876.62 83882 132 1271 13.05 12.97
05/11 01:00 0.00 ---- 876.59 83804 131 1270 13.05 12.97
05/11 02:00 0.00 ---- 876.55 83699 131 1270 13.05 12.97
05/11 03:00 0.00 ---- 876.52 83621 131 1270 13.05 12.97
05/11 04:00 0.00 ---- 876.48 83516 131 1270 13.05 12.97
05/11 05:00 0.00 ---- 876.44 83412 131 1269 13.05 12.97
05/11 06:00 0.00 ---- 876.41 83333 67 1269 13.05 12.97
05/11 07:00 0.00 ---- 876.37 83229 67 1269 13.05 12.97
05/11 08:00 0.00 ---- 876.33 83124 130 1269 13.05 12.97
05/11 09:00 0.00 ---- 876.29 83019 192 1268 13.05 12.97
05/11 10:00 0.00 ---- 876.26 82941 192 1268 13.05 12.97
05/11 11:00 0.00 ---- 876.24 82889 255 1268 13.05 12.97
05/11 12:00 0.00 ---- 876.20 82784 255 1268 13.05 12.97
05/11 13:00 0.00 ---- 876.17 82706 192 1267 13.05 12.97
05/11 14:00 0.00 ---- 876.13 82601 191 1267 13.05 12.97
05/11 15:00 0.00 ---- 876.09 82496 191 1267 13.05 12.97
05/11 16:00 0.00 ---- 876.07 82444 191 1267 13.05 12.97
05/11 17:00 0.00 ---- 876.03 82339 197 1266 13.05 12.97
05/11 18:00 0.00 ---- 876.00 82261 264 1266 13.05 12.97
05/11 19:00 0.00 ---- 875.96 82159 143 1266 13.05 12.97
05/11 20:00 0.00 ---- 875.93 82082 211 1266 13.05 12.97
05/11 21:00 0.00 ---- 875.89 81980 153 1265 13.05 12.97
05/11 22:00 0.00 ---- 875.86 81903 276 1265 13.05 12.97
05/11 23:00 0.00 ---- 875.82 81801 ---- ---- 13.05 12.97
Data processed at Mon 12May2025 04:03 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ARBU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ARBU.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ARBU.Elev.Inst.1Hour.0.Ccp-Rev
ARBU.Stor.Inst.1Hour.0.Ccp-Rev
ARBU.Flow-Res In.Ave.1Hour.1Hour.Rev-Regi-Computed
ARBU.Flow-Res Out.Inst.1Hour.0.Rev-Regi-Flowgroup
ARBU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
ARBU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.