ARBO2: Arbuckle Lake

                                SHEF ID:       ARBO2     Arbuckle Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 872.00, Top = 885.30

PRECIP PRECIP(A) ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(America/Chicago)
05/02 00:00 0.00 ---- 875.69 81469 558 1 13.05 12.97
05/02 01:00 0.00 ---- 875.70 81494 558 1 13.05 12.97
05/02 02:00 0.00 ---- 875.72 81546 681 1 13.05 12.97
05/02 03:00 0.00 ---- 875.74 81597 1052 1 13.05 12.97
05/02 04:00 0.29 ---- 875.78 81699 1547 1 13.05 12.97
05/02 05:00 0.66 ---- 875.86 81903 1985 1 13.05 12.97
05/02 06:00 0.12 ---- 875.95 82133 2748 1 13.05 12.97
05/02 07:00 0.05 ---- 876.04 82366 3513 1 13.05 12.97
05/02 08:00 0.08 ---- 876.18 82732 3967 1 13.05 12.97
05/02 09:00 0.07 ---- 876.34 83150 4360 1 13.05 12.97
05/02 10:00 0.09 ---- 876.49 83542 4621 1 13.05 12.97
05/02 11:00 0.10 ---- 876.64 83935 4494 1 13.05 12.97
05/02 12:00 0.06 ---- 876.77 84275 4242 1 13.05 12.97
05/02 13:00 0.03 ---- 876.89 84588 4005 1 13.05 12.97
05/02 14:00 0.00 ---- 877.01 84903 3639 1 13.05 12.97
05/02 15:00 0.00 ---- 877.12 85197 3334 1 13.05 12.97
05/02 16:00 0.00 ---- 877.21 85438 3028 1 13.05 12.97
05/02 17:00 0.00 ---- 877.29 85652 2655 1 13.05 12.97
05/02 18:00 0.00 ---- 877.36 85839 2332 1 13.05 12.97
05/02 19:00 0.00 ---- 877.42 86000 2072 1 13.05 12.97
05/02 20:00 0.00 ---- 877.48 86160 1813 1 13.05 12.97
05/02 21:00 0.00 ---- 877.53 86294 1684 1 13.05 12.97
05/02 22:00 0.00 ---- 877.57 86401 1489 1 13.05 12.97
05/02 23:00 0.00 ---- 877.61 86508 ---- ---- 13.05 12.97
Data processed at Sat 03May2025 04:03 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ARBU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ARBU.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ARBU.Elev.Inst.1Hour.0.Ccp-Rev
ARBU.Stor.Inst.1Hour.0.Ccp-Rev
ARBU.Flow-Res In.Ave.1Hour.1Hour.Rev-Regi-Computed
ARBU.Flow-Res Out.Inst.1Hour.0.Rev-Regi-Flowgroup
ARBU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
ARBU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.