ARBO2: Arbuckle Lake

                                SHEF ID:       ARBO2     Arbuckle Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 872.00, Top = 885.30

PRECIP PRECIP(A) ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(America/Chicago)
04/27 00:00 0.00 ---- 874.66 78858 1035 1035 13.05 12.97
04/27 01:00 0.00 ---- 874.66 78858 974 1035 13.05 12.97
04/27 02:00 0.00 ---- 874.65 78833 853 1034 13.05 12.97
04/27 03:00 0.00 ---- 874.65 78833 793 1034 13.05 12.97
04/27 04:00 0.00 ---- 874.63 78783 672 1034 13.05 12.97
04/27 05:00 0.00 ---- 874.62 78758 672 1034 13.05 12.97
04/27 06:00 0.00 ---- 874.60 78708 612 1034 13.05 12.97
04/27 07:00 0.00 ---- 874.59 78683 672 1034 13.05 12.97
04/27 08:00 0.00 ---- 874.58 78658 612 1034 13.05 12.97
04/27 09:00 0.00 ---- 874.57 78633 612 1034 13.05 12.89
04/27 10:00 0.00 ---- 874.55 78583 672 1034 13.05 12.97
04/27 11:00 0.00 ---- 874.53 78533 611 1034 13.05 12.97
04/27 12:00 0.00 ---- 874.53 78533 611 1034 13.05 12.97
04/27 13:00 0.00 ---- 874.51 78483 611 1034 13.05 12.97
04/27 14:00 0.00 ---- 874.50 78458 611 1034 13.05 12.97
04/27 15:00 0.00 ---- 874.48 78409 551 1033 13.05 12.97
04/27 16:00 0.00 ---- 874.46 78359 490 1033 13.05 12.97
04/27 17:00 0.00 ---- 874.45 78334 490 1033 13.05 12.97
04/27 18:00 0.00 ---- 874.42 78259 490 1033 13.05 12.97
04/27 19:00 0.00 ---- 874.41 78234 550 1033 13.05 12.97
04/27 20:00 0.00 ---- 874.39 78184 429 1033 13.05 12.97
04/27 21:00 0.00 ---- 874.38 78159 550 1033 13.05 12.97
04/27 22:00 0.00 ---- 874.35 78084 308 1033 13.05 12.97
04/27 23:00 0.00 ---- 874.33 78034 ---- ---- 13.05 12.97
Data processed at Mon 28Apr2025 04:03 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ARBU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ARBU.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ARBU.Elev.Inst.1Hour.0.Ccp-Rev
ARBU.Stor.Inst.1Hour.0.Ccp-Rev
ARBU.Flow-Res In.Ave.1Hour.1Hour.Rev-Regi-Computed
ARBU.Flow-Res Out.Inst.1Hour.0.Rev-Regi-Flowgroup
ARBU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
ARBU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.