ARBO2: Arbuckle Lake

                                SHEF ID:       ARBO2     Arbuckle Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 872.00, Top = 885.30

PRECIP PRECIP(A) ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(America/Chicago)
04/25 00:00 0.00 ---- 875.11 79987 546 1474 13.05 12.97
04/25 01:00 0.00 ---- 875.08 79910 484 1473 13.05 12.97
04/25 02:00 0.00 ---- 875.04 79808 608 1473 13.05 12.97
04/25 03:00 0.00 ---- 875.01 79732 672 1473 13.05 12.97
04/25 04:00 0.21 ---- 875.00 79706 677 1473 13.05 12.97
04/25 05:00 0.02 ---- 874.98 79656 682 1473 13.05 12.97
04/25 06:00 0.00 ---- 874.95 79581 747 1472 13.05 12.97
04/25 07:00 0.00 ---- 874.91 79482 661 1472 13.05 12.97
04/25 08:00 0.00 ---- 874.89 79432 694 1036 13.05 12.97
04/25 09:00 0.00 ---- 874.88 79407 788 1036 13.05 12.97
04/25 10:00 0.00 ---- 874.88 79407 882 1036 13.05 12.97
04/25 11:00 0.21 ---- 874.88 79407 855 1036 13.05 12.97
04/25 12:00 0.03 ---- 874.87 79382 975 1036 13.05 12.97
04/25 13:00 0.00 ---- 874.86 79357 1036 1036 13.05 12.97
04/25 14:00 0.00 ---- 874.87 79382 1157 1036 13.05 12.97
04/25 15:00 0.00 ---- 874.88 79407 1217 1036 13.05 12.97
04/25 16:00 0.00 ---- 874.90 79457 1278 1036 13.05 12.97
04/25 17:00 0.00 ---- 874.90 79457 1217 1036 13.05 12.97
04/25 18:00 0.00 ---- 874.90 79457 1157 1036 13.05 12.97
04/25 19:00 0.00 ---- 874.90 79457 976 1036 13.05 12.97
04/25 20:00 0.00 ---- 874.90 79457 915 1036 13.05 12.97
04/25 21:00 0.00 ---- 874.89 79432 855 1036 13.05 12.97
04/25 22:00 0.00 ---- 874.88 79407 794 1036 13.05 12.97
04/25 23:00 0.00 ---- 874.86 79357 ---- ---- 13.05 12.97
Data processed at Sat 26Apr2025 04:03 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ARBU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ARBU.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ARBU.Elev.Inst.1Hour.0.Ccp-Rev
ARBU.Stor.Inst.1Hour.0.Ccp-Rev
ARBU.Flow-Res In.Ave.1Hour.1Hour.Rev-Regi-Computed
ARBU.Flow-Res Out.Inst.1Hour.0.Rev-Regi-Flowgroup
ARBU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
ARBU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.