ARBO2: Arbuckle Lake

                                SHEF ID:       ARBO2     Arbuckle Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 872.00, Top = 885.30

PRECIP PRECIP(A) ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(America/Chicago)
04/22 00:00 0.00 ---- 877.09 85117 455 1491 13.05 12.97
04/22 01:00 0.00 ---- 877.06 85036 520 1490 13.05 12.97
04/22 02:00 0.00 ---- 877.03 84956 461 1490 13.05 12.97
04/22 03:00 0.00 ---- 877.00 84876 528 1490 13.05 12.97
04/22 04:00 0.00 ---- 876.96 84771 469 1490 13.05 12.97
04/22 05:00 0.00 ---- 876.94 84719 409 1489 13.05 12.97
04/22 06:00 0.00 ---- 876.90 84615 477 1489 13.05 12.97
04/22 07:00 0.00 ---- 876.86 84510 540 1489 13.05 12.97
04/22 08:00 0.00 ---- 876.84 84458 476 1489 13.05 12.97
04/22 09:00 0.00 ---- 876.81 84379 539 1488 13.05 12.97
04/22 10:00 0.00 ---- 876.78 84301 602 1488 13.05 12.97
04/22 11:00 0.00 ---- 876.75 84222 602 1488 13.05 12.97
04/22 12:00 0.00 ---- 876.72 84144 665 1488 13.05 12.97
04/22 13:00 0.00 ---- 876.70 84091 601 1487 13.05 12.97
04/22 14:00 0.00 ---- 876.68 84039 728 1487 13.05 12.97
04/22 15:00 0.00 ---- 876.64 83935 727 1487 13.05 12.97
04/22 16:00 0.00 ---- 876.63 83908 601 1487 13.05 12.97
04/22 17:00 0.00 ---- 876.60 83830 601 1486 13.05 12.97
04/22 18:00 0.00 ---- 876.56 83725 664 1486 13.05 12.97
04/22 19:00 0.00 ---- 876.54 83673 537 1486 13.05 12.97
04/22 20:00 0.00 ---- 876.51 83595 537 1486 13.05 12.97
04/22 21:00 0.00 ---- 876.48 83516 600 1485 13.05 12.97
04/22 22:00 0.00 ---- 876.45 83438 537 1485 13.05 12.97
04/22 23:00 0.00 ---- 876.41 83333 ---- ---- 13.05 12.97
Data processed at Wed 23Apr2025 04:03 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ARBU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ARBU.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ARBU.Elev.Inst.1Hour.0.Ccp-Rev
ARBU.Stor.Inst.1Hour.0.Ccp-Rev
ARBU.Flow-Res In.Ave.1Hour.1Hour.Rev-Regi-Computed
ARBU.Flow-Res Out.Inst.1Hour.0.Rev-Regi-Flowgroup
ARBU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
ARBU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.