ARBO2: Arbuckle Lake

                                SHEF ID:       ARBO2     Arbuckle Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 872.00, Top = 885.30

PRECIP PRECIP(A) ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(America/Chicago)
06/12 00:00 0.00 ---- 873.57 76164 42 83 13.05 12.97
06/12 01:00 0.00 ---- 873.57 76164 32 83 13.05 12.97
06/12 02:00 0.00 ---- 873.57 76164 42 83 13.05 12.97
06/12 03:00 0.00 ---- 873.56 76140 42 83 13.05 12.97
06/12 04:00 0.00 ---- 873.56 76140 33 83 ---- ----
06/12 05:00 0.00 ---- 873.56 76140 23 83 13.05 12.97
06/12 06:00 0.00 ---- 873.56 76140 25 83 13.05 12.97
06/12 07:00 ---- ---- ---- ---- 16 83 ---- ----
06/12 08:00 ---- ---- 873.55 76115 18 83 ---- ----
06/12 09:00 0.00 ---- 873.55 76115 29 83 13.05 12.97
06/12 10:00 ---- ---- ---- ---- 44 83 ---- ----
06/12 11:00 ---- ---- 873.55 76115 59 83 ---- ----
06/12 12:00 0.00 ---- 873.55 76115 75 83 13.05 12.97
06/12 13:00 0.00 ---- 873.55 76115 79 83 13.05 12.97
06/12 14:00 0.00 ---- 873.55 76115 83 83 ---- ----
06/12 15:00 0.00 ---- 873.55 76115 142 83 13.05 12.97
06/12 16:00 0.00 ---- 873.55 76115 142 83 13.05 12.97
06/12 17:00 0.00 ---- 873.56 76140 142 83 13.05 12.97
06/12 18:00 0.00 ---- 873.56 76140 142 83 13.05 12.97
06/12 19:00 0.00 ---- 873.56 76140 142 83 13.05 12.97
06/12 20:00 0.00 ---- 873.56 76140 83 83 13.05 12.97
06/12 21:00 0.00 ---- 873.56 76140 83 83 13.05 12.97
06/12 22:00 0.00 ---- 873.56 76140 83 83 13.05 12.97
06/12 23:00 0.00 ---- 873.56 76140 ---- ---- 13.05 12.97
Data processed at Thu 13Jun2024 04:03 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ARBU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ARBU.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ARBU.Elev.Inst.1Hour.0.Ccp-Rev
ARBU.Stor.Inst.1Hour.0.Ccp-Rev
ARBU.Flow-Res In.Ave.1Hour.1Hour.Rev-Regi-Computed
ARBU.Flow-Res Out.Inst.1Hour.0.Rev-Regi-Flowgroup
ARBU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
ARBU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.