ARBO2: Arbuckle Lake

                                SHEF ID:       ARBO2     Arbuckle Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 872.00, Top = 885.30

PRECIP PRECIP(A) ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(America/Chicago)
06/09 00:00 ---- ---- ---- ---- 518 960 ---- ----
06/09 01:00 ---- ---- ---- ---- 518 960 ---- ----
06/09 02:00 ---- ---- 874.90 79457 518 960 ---- ----
06/09 03:00 0.00 ---- 874.88 79407 518 959 13.05 12.97
06/09 04:00 0.00 ---- 874.84 79307 518 959 13.05 12.97
06/09 05:00 0.00 ---- 874.82 79257 0 959 13.05 12.97
06/09 06:00 0.00 ---- 874.79 79182 0 959 13.05 12.97
06/09 07:00 0.00 ---- 874.76 79107 0 959 13.05 12.97
06/09 08:00 0.00 ---- 874.74 79057 0 959 13.05 12.97
06/09 09:00 0.00 ---- 874.71 78982 0 958 13.05 12.97
06/09 10:00 0.00 ---- 874.68 78908 0 958 13.05 12.97
06/09 11:00 0.00 ---- 874.66 78858 0 958 ---- ----
06/09 12:00 0.00 ---- 874.63 78783 0 958 13.05 12.97
06/09 13:00 0.00 ---- 874.60 78708 0 958 ---- ----
06/09 14:00 0.00 ---- 874.58 78658 1 958 13.05 12.97
06/09 15:00 ---- ---- ---- ---- 427 958 ---- ----
06/09 16:00 ---- ---- ---- ---- 427 958 ---- ----
06/09 17:00 ---- ---- 874.51 78483 427 957 ---- ----
06/09 18:00 0.00 ---- 874.48 78409 427 957 13.05 12.97
06/09 19:00 0.00 ---- 874.45 78334 427 957 ---- ----
06/09 20:00 0.00 ---- 874.43 78284 1 957 13.05 12.97
06/09 21:00 ---- ---- ---- ---- ---- 957 ---- ----
06/09 22:00 ---- ---- ---- ---- ---- 957 ---- ----
06/09 23:00 ---- ---- ---- ---- ---- ---- ---- ----
Data processed at Mon 10Jun2024 04:03 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ARBU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ARBU.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ARBU.Elev.Inst.1Hour.0.Ccp-Rev
ARBU.Stor.Inst.1Hour.0.Ccp-Rev
ARBU.Flow-Res In.Ave.1Hour.1Hour.Rev-Regi-Computed
ARBU.Flow-Res Out.Inst.1Hour.0.Rev-Regi-Flowgroup
ARBU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
ARBU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.