ARBO2: Arbuckle Lake

                                SHEF ID:       ARBO2     Arbuckle Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 872.00, Top = 885.30

PRECIP PRECIP(A) ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(America/Chicago)
06/04 00:00 0.00 ---- 873.70 76480 496 83 13.05 12.97
06/04 01:00 0.00 ---- 873.70 76480 437 83 13.05 12.97
06/04 02:00 0.00 ---- 873.71 76505 908 83 13.05 12.97
06/04 03:00 0.00 ---- 873.72 76529 1321 83 13.05 12.97
06/04 04:00 1.01 ---- 873.83 76797 2153 83 13.05 12.97
06/04 05:00 0.01 ---- 873.91 76992 3000 83 13.05 12.97
06/04 06:00 0.00 ---- 874.05 77336 3847 83 13.05 12.97
06/04 07:00 0.00 ---- 874.20 77710 3972 83 13.05 12.97
06/04 08:00 0.00 ---- 874.35 78084 4032 327 13.05 12.97
06/04 09:00 0.00 ---- 874.47 78384 3671 328 ---- ----
06/04 10:00 0.00 ---- 874.55 78583 3117 328 13.05 12.97
06/04 11:00 0.00 ---- 874.62 78758 2501 328 13.05 12.97
06/04 12:00 0.00 ---- 874.67 78883 1958 328 13.05 12.97
06/04 13:00 0.00 ---- 874.71 78982 1717 328 13.05 12.97
06/04 14:00 0.00 ---- 874.74 79057 1415 328 13.05 12.97
06/04 15:00 0.00 ---- 874.78 79157 1294 328 13.05 12.97
06/04 16:00 0.00 ---- 874.80 79207 1174 328 13.05 12.97
06/04 17:00 0.00 ---- 874.83 79282 1113 328 13.05 12.97
06/04 18:00 0.00 ---- 874.85 79332 932 328 13.05 12.97
06/04 19:00 0.00 ---- 874.87 79382 932 328 13.05 12.97
06/04 20:00 0.00 ---- 874.88 79407 811 328 13.05 12.97
06/04 21:00 0.00 ---- 874.90 79457 872 328 13.05 12.97
06/04 22:00 0.00 ---- 874.91 79482 ---- ---- 13.05 12.97
06/04 23:00 0.09 ---- 874.92 79506 ---- ---- 13.05 12.97
Data processed at Wed 05Jun2024 04:03 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ARBU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ARBU.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ARBU.Elev.Inst.1Hour.0.Ccp-Rev
ARBU.Stor.Inst.1Hour.0.Ccp-Rev
ARBU.Flow-Res In.Ave.1Hour.1Hour.Rev-Regi-Computed
ARBU.Flow-Res Out.Inst.1Hour.0.Rev-Regi-Flowgroup
ARBU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
ARBU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.