ARBO2: Arbuckle Lake

                                SHEF ID:       ARBO2     Arbuckle Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 872.00, Top = 885.30

PRECIP PRECIP(A) ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(America/Chicago)
05/05 00:00 0.00 ---- 877.29 85652 659 1824 13.05 12.97
05/05 01:00 0.00 ---- 877.25 85545 723 1823 13.05 12.97
05/05 02:00 0.38 ---- 877.25 85545 788 1823 13.05 12.97
05/05 03:00 0.06 ---- 877.22 85464 917 1823 13.05 12.97
05/05 04:00 0.04 ---- 877.18 85357 916 1823 13.05 12.97
05/05 05:00 0.04 ---- 877.15 85277 657 1822 13.05 12.97
05/05 06:00 0.04 ---- 877.11 85170 657 1822 13.05 12.97
05/05 07:00 0.04 ---- 877.07 85063 916 1822 13.05 12.97
05/05 08:00 0.08 ---- 877.04 84983 980 1821 13.05 12.97
05/05 09:00 0.45 ---- 877.04 84983 1304 1821 13.05 12.97
05/05 10:00 0.25 ---- 877.02 84929 1627 1821 13.05 12.97
05/05 11:00 0.18 ---- 877.03 84956 1756 1821 13.05 12.97
05/05 12:00 0.06 ---- 877.04 84983 1756 1821 13.05 12.97
05/05 13:00 0.00 ---- 877.03 84956 1821 1821 13.05 12.97
05/05 14:00 0.04 ---- 877.03 84956 1692 1821 13.05 12.97
05/05 15:00 0.00 ---- 877.02 84929 1627 1821 13.05 12.97
05/05 16:00 0.00 ---- 877.01 84903 1564 1821 13.05 12.97
05/05 17:00 0.00 ---- 877.01 84903 1564 1821 13.05 12.97
05/05 18:00 0.00 ---- 876.99 84850 1502 1821 13.05 12.97
05/05 19:00 0.00 ---- 876.99 84850 1376 1821 13.05 12.97
05/05 20:00 0.00 ---- 876.97 84798 1250 1821 13.05 12.97
05/05 21:00 0.00 ---- 876.94 84719 1188 1820 13.05 12.97
05/05 22:00 0.00 ---- 876.92 84667 1124 1820 13.05 12.97
05/05 23:00 0.00 ---- 876.89 84588 ---- ---- 13.05 12.97
Data processed at Mon 06May2024 04:04 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ARBU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ARBU.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ARBU.Elev.Inst.1Hour.0.Ccp-Rev
ARBU.Stor.Inst.1Hour.0.Ccp-Rev
ARBU.Flow-Res In.Ave.1Hour.1Hour.Rev-Regi-Computed
ARBU.Flow-Res Out.Inst.1Hour.0.Rev-Regi-Flowgroup
ARBU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
ARBU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.