ARBO2: Arbuckle Lake

                                SHEF ID:       ARBO2     Arbuckle Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 872.00, Top = 885.30

PRECIP PRECIP(A) ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(America/Chicago)
04/28 00:00 2.31 ---- 872.26 73017 17018 1 13.05 12.97
04/28 01:00 1.59 ---- 873.28 75458 24733 1 13.05 12.97
04/28 02:00 0.29 ---- 874.48 78409 31010 1 13.05 12.97
04/28 03:00 0.24 ---- 875.74 81597 33490 1 13.05 12.97
04/28 04:00 0.21 ---- 876.88 84562 32113 1 13.05 12.97
04/28 05:00 0.21 ---- 877.74 86855 28347 1 13.05 12.97
04/28 06:00 0.04 ---- 878.43 88727 22652 1 13.05 12.97
04/28 07:00 0.01 ---- 878.94 90122 16828 1 13.05 12.97
04/28 08:00 0.00 ---- 879.24 90957 12292 1 13.05 12.97
04/28 09:00 0.00 ---- 879.44 91515 8642 1 13.05 12.97
04/28 10:00 0.00 ---- 879.59 91934 5942 1 13.05 12.97
04/28 11:00 0.00 ---- 879.72 92298 4497 1 13.05 12.97
04/28 12:00 0.00 ---- 879.82 92577 3651 504 13.05 12.97
04/28 13:00 0.00 ---- 879.89 92773 3104 504 13.05 12.97
04/28 14:00 0.00 ---- 879.95 92940 2628 987 13.05 12.97
04/28 15:00 0.00 ---- 879.99 93052 2356 987 13.05 12.97
04/28 16:00 0.00 ---- 880.02 93137 2255 987 13.05 12.97
04/28 17:00 0.00 ---- 880.05 93223 2154 988 13.05 12.97
04/28 18:00 0.00 ---- 880.09 93337 2021 988 13.05 12.97
04/28 19:00 0.00 ---- 880.12 93422 1954 988 13.05 12.97
04/28 20:00 0.00 ---- 880.14 93479 1954 988 13.05 12.97
04/28 21:00 0.00 ---- 880.16 93536 1817 988 13.05 12.97
04/28 22:00 0.00 ---- 880.19 93622 1886 988 13.05 12.97
04/28 23:00 0.00 ---- 880.20 93650 ---- ---- 13.05 12.97
Data processed at Mon 29Apr2024 04:04 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ARBU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ARBU.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ARBU.Elev.Inst.1Hour.0.Ccp-Rev
ARBU.Stor.Inst.1Hour.0.Ccp-Rev
ARBU.Flow-Res In.Ave.1Hour.1Hour.Rev-Regi-Computed
ARBU.Flow-Res Out.Inst.1Hour.0.Rev-Regi-Flowgroup
ARBU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
ARBU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.