ARBO2: Arbuckle Lake

                                
SHEF ID:       ARBO2     Arbuckle Lake
STATION TYPE:  RESERVOIR
Flood Pool:  Bottom =   872.00, Top =   885.30

               PRECIP PRECIP(A) ELEVATION   STORAGE    INFLOW   RELEASE   VOLTAGE  BAT-LOAD
                   in        in        ft     ac-ft       cfs       cfs      volt      volt
              Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev  Rev-Regi  Rev-Regi   Ccp-Rev   Ccp-Rev
(US/Central)
07/19 00:00      0.00      ----    873.50     75993         0       165     13.05     12.97
07/19 01:00      0.00      ----    873.50     75993         0       165     13.05     12.97
07/19 02:00      0.00      ----    873.48     75945         0       165     13.05     12.97
07/19 03:00      0.00      ----    873.48     75945         0       165     13.05     12.97
07/19 04:00      0.00      ----    873.47     75920         0       165     13.05     12.97
07/19 05:00      0.00      ----    873.46     75896         0       165     13.05     12.97
07/19 06:00      0.00      ----    873.45     75872         0       165     13.05     12.97
07/19 07:00      0.00      ----    873.44     75847         0       165     13.05     12.97
07/19 08:00      0.00      ----    873.44     75847         0       165     13.05     12.97
07/19 09:00      0.00      ----    873.43     75823         0       165     13.05     12.97
07/19 10:00      0.00      ----    873.43     75823         0       165     13.05     12.97
07/19 11:00      0.00      ----    873.42     75799         0       165     13.05     12.97
07/19 12:00      0.00      ----    873.42     75799         0       165     13.05     12.97
07/19 13:00      0.00      ----    873.41     75774         2       165     13.05     12.97
07/19 14:00      0.00      ----    873.41     75774         5       165     13.05     12.97
07/19 15:00      0.00      ----    873.41     75774        28       165     13.05     12.97
07/19 16:00      0.00      ----    873.40     75750        51       165     13.05     12.97
07/19 17:00      0.00      ----    873.40     75750        53       165     13.05     12.97
07/19 18:00      0.00      ----    873.40     75750        53       165     13.05     12.97
07/19 19:00      0.00      ----    873.40     75750        53       165     13.05     12.97
07/19 20:00      0.00      ----    873.39     75726        33       165     13.05     12.97
07/19 21:00      0.00      ----    873.39     75726        10       165     13.05     12.97
07/19 22:00      0.00      ----    873.38     75701        10       165     13.05     12.97
07/19 23:00      0.00      ----    873.37     75677         5       165     13.05     12.97

                            
Data processed at Thu 20Jul2023 04:15 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ARBU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ARBU.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ARBU.Elev.Inst.1Hour.0.Ccp-Rev
ARBU.Stor.Inst.1Hour.0.Ccp-Rev
ARBU.Flow-Res In.Ave.1Hour.1Hour.Rev-Regi-Computed
ARBU.Flow-Res Out.Inst.1Hour.0.Rev-Regi-Flowgroup
ARBU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
ARBU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.