ARBO2: Arbuckle Lake
Data processed at Thu 16Feb2023 05:14 GMT
All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice.
Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited.
These data are gathered electronically and, as presented, have not undergone any form of quality control. These data are not guaranteed to be valid or correct.
Go to home page.
Go to station list.
Upstream stations:
Downstream station:Previous Day
Next Day
Current Day
SHEF ID: ARBO2 Arbuckle Lake STATION TYPE: RESERVOIR Flood Pool: Bottom = 872.00, Top = 885.30 PRECIP ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD in ft ac-ft cfs cfs volt volt Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev (US/Central) 02/15 00:00 0.00 868.75 65033 0 1 13.05 12.97 02/15 01:00 0.00 868.75 65033 0 1 13.05 12.97 02/15 02:00 0.00 868.75 65033 0 1 13.05 12.97 02/15 03:00 0.00 868.75 65033 0 1 13.05 12.97 02/15 04:00 0.00 868.74 65011 0 1 13.05 12.97 02/15 05:00 0.00 868.74 65011 0 1 13.05 12.97 02/15 06:00 0.00 868.74 65011 0 1 13.05 12.97 02/15 07:00 0.00 868.74 65011 0 1 13.05 12.97 02/15 08:00 0.00 868.74 65011 0 1 13.05 12.97 02/15 09:00 0.00 868.74 65011 0 1 13.05 12.97 02/15 10:00 0.00 868.75 65033 0 1 13.05 12.97 02/15 11:00 0.00 868.74 65011 53 1 13.05 12.97 02/15 12:00 0.00 868.74 65011 53 1 13.05 12.97 02/15 13:00 0.00 868.75 65033 53 1 13.05 12.97 02/15 14:00 0.00 868.75 65033 54 1 13.05 12.97 02/15 15:00 0.00 868.75 65033 106 1 13.05 12.97 02/15 16:00 0.00 868.75 65033 54 1 13.05 12.97 02/15 17:00 0.00 868.76 65055 106 1 13.05 12.97 02/15 18:00 0.00 868.76 65055 106 1 13.05 12.97 02/15 19:00 0.00 868.77 65077 212 1 13.05 12.97 02/15 20:00 0.02 868.77 65077 370 1 13.05 12.97 02/15 21:00 0.01 868.79 65120 370 1 13.05 12.97 02/15 22:00 0.03 868.83 65208 528 1 13.05 12.97 02/15 23:00 0.10 868.83 65208 317 1 13.05 12.97