ANDO2: Washita River, OK

                                SHEF ID:       ANDO2     Washita River at Anadarko, OK
STATION TYPE:
Regulating: Stage = 19.00, Flow = 6702

PRECIP PRECIP(A) STAGE RIV-FLOW BAT-LOAD
in in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/18 00:00 ---- 0.00 11.39 2049 12.40
06/18 01:00 ---- 0.00 11.36 2035 12.37
06/18 02:00 ---- 0.00 11.29 2001 12.36
06/18 03:00 ---- 0.00 11.27 1992 12.36
06/18 04:00 ---- 0.00 11.27 1992 12.34
06/18 05:00 ---- 0.00 11.23 1973 12.33
06/18 06:00 ---- 0.00 11.18 1949 12.31
06/18 07:00 ---- 0.03 11.14 1930 12.31
06/18 08:00 ---- 0.02 11.08 1902 12.34
06/18 09:00 ---- 0.02 11.01 1869 12.78
06/18 10:00 ---- 0.01 10.94 1836 13.08
06/18 11:00 ---- 0.00 10.89 1812 13.29
06/18 12:00 ---- 0.00 10.85 1794 13.24
06/18 13:00 ---- 0.00 10.80 1771 13.26
06/18 14:00 ---- 0.00 10.73 1738 13.25
06/18 15:00 ---- 0.00 10.65 1701 13.58
06/18 16:00 ---- 0.00 10.60 1678 13.26
06/18 17:00 ---- 0.00 10.56 1660 13.28
06/18 18:00 ---- 0.00 10.49 1628 13.22
06/18 19:00 ---- 0.00 10.44 1605 13.13
06/18 20:00 ---- 0.00 10.37 1573 13.07
06/18 21:00 ---- 0.00 10.32 1551 12.82
06/18 22:00 ---- 0.00 10.28 1534 12.57
06/18 23:00 ---- 0.00 10.22 1508 12.45
Data processed at Thu 19Jun2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ANAD.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ANAD.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ANAD.Stage.Inst.1Hour.0.Ccp-Rev
ANAD.Flow.Inst.1Hour.0.Ccp-Rev
ANAD.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.