ANDO2: Washita River, OK

                                SHEF ID:       ANDO2     Washita River at Anadarko, OK
STATION TYPE:
Regulating: Stage = 19.00, Flow = 6702

PRECIP PRECIP(A) STAGE RIV-FLOW BAT-LOAD
in in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
05/03 00:00 ---- 0.00 17.01 5417 12.40
05/03 01:00 ---- 0.00 16.84 5322 12.37
05/03 02:00 ---- 0.00 16.71 5249 12.35
05/03 03:00 ---- 0.00 16.49 5127 12.34
05/03 04:00 ---- 0.00 16.27 5006 12.32
05/03 05:00 ---- 0.00 15.99 4816 12.31
05/03 06:00 ---- 0.00 15.71 4628 12.30
05/03 07:00 ---- 0.00 15.44 4446 12.27
05/03 08:00 ---- 0.00 15.16 4260 12.50
05/03 09:00 ---- 0.00 14.90 4090 13.36
05/03 10:00 ---- 0.00 14.64 3921 13.42
05/03 11:00 ---- 0.00 14.37 3749 13.45
05/03 12:00 ---- 0.00 14.13 3597 13.51
05/03 13:00 ---- 0.00 13.88 3442 13.56
05/03 14:00 ---- 0.00 13.68 3319 13.53
05/03 15:00 ---- 0.00 13.50 3209 13.49
05/03 16:00 ---- 0.00 13.34 3111 13.49
05/03 17:00 ---- 0.00 13.25 3057 13.19
05/03 18:00 ---- 0.00 13.15 2997 13.16
05/03 19:00 ---- 0.00 13.09 2961 13.04
05/03 20:00 ---- 0.00 13.03 2925 12.98
05/03 21:00 ---- 0.00 13.00 2907 12.73
05/03 22:00 ---- 0.00 12.93 2865 12.55
05/03 23:00 ---- 0.00 12.88 2836 12.46
Data processed at Sun 04May2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ANAD.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ANAD.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ANAD.Stage.Inst.1Hour.0.Ccp-Rev
ANAD.Flow.Inst.1Hour.0.Ccp-Rev
ANAD.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.