ANDO2: Washita River, OK

                                SHEF ID:       ANDO2     Washita River at Anadarko, OK
STATION TYPE:
Regulating: Stage = 19.00, Flow = 6702

PRECIP PRECIP(A) STAGE RIV-FLOW BAT-LOAD
in in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
11/21 00:00 ---- 0.00 11.06 1888 12.32
11/21 01:00 ---- 0.00 10.93 1827 12.30
11/21 02:00 ---- 0.00 10.82 1776 12.27
11/21 03:00 ---- 0.00 10.73 1734 12.26
11/21 04:00 ---- 0.00 10.64 1692 12.24
11/21 05:00 ---- 0.00 10.52 1637 12.23
11/21 06:00 ---- 0.00 10.44 1601 12.21
11/21 07:00 ---- 0.00 10.34 1556 12.19
11/21 08:00 ---- 0.00 10.28 1530 12.21
11/21 09:00 ---- 0.00 10.15 1473 13.32
11/21 10:00 ---- 0.00 10.10 1452 13.05
11/21 11:00 ---- 0.00 10.05 1430 13.24
11/21 12:00 ---- 0.00 9.97 1396 13.60
11/21 13:00 ---- 0.00 9.91 1371 13.25
11/21 14:00 ---- 0.00 9.85 1345 13.11
11/21 15:00 ---- 0.00 9.78 1315 12.92
11/21 16:00 ---- 0.00 9.74 1299 12.88
11/21 17:00 ---- 0.00 9.62 1247 12.86
11/21 18:00 ---- 0.00 9.57 1226 12.70
11/21 19:00 ---- 0.00 9.51 1200 12.57
11/21 20:00 ---- 0.00 9.45 1174 12.47
11/21 21:00 ---- 0.00 9.41 1157 12.41
11/21 22:00 ---- 0.00 9.33 1123 12.37
11/21 23:00 ---- 0.00 9.27 1097 12.34
Data processed at Fri 22Nov2024 05:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ANAD.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ANAD.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ANAD.Stage.Inst.1Hour.0.Ccp-Rev
ANAD.Flow.Inst.1Hour.0.Ccp-Rev
ANAD.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.