ANDO2: Washita River, OK

                                SHEF ID:       ANDO2     Washita River at Anadarko, OK
STATION TYPE:
Regulating: Stage = 19.00, Flow = 6702

PRECIP PRECIP(A) STAGE RIV-FLOW BAT-LOAD
in in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
11/03 00:00 ---- 0.80 6.76 57 12.32
11/03 01:00 ---- ---- 7.06 158 12.30
11/03 01:00 ---- 0.77 7.20 213 12.31
11/03 02:00 ---- 0.14 7.29 252 12.29
11/03 03:00 ---- 0.00 7.23 226 12.27
11/03 04:00 ---- 0.00 7.14 189 12.27
11/03 05:00 ---- 0.00 7.15 193 12.25
11/03 06:00 ---- 0.01 7.23 226 12.24
11/03 07:00 ---- 0.03 7.31 260 12.23
11/03 08:00 ---- 0.07 7.33 269 12.21
11/03 09:00 ---- 0.00 7.30 256 12.86
11/03 10:00 ---- 0.00 7.29 252 13.03
11/03 11:00 ---- 0.00 7.25 235 12.96
11/03 12:00 ---- 0.01 7.23 226 12.94
11/03 13:00 ---- 0.04 7.21 217 12.99
11/03 14:00 ---- 0.46 7.25 235 12.96
11/03 15:00 ---- 0.23 7.28 248 12.72
11/03 16:00 ---- 0.00 7.30 256 12.56
11/03 17:00 ---- 0.00 7.35 278 12.96
11/03 18:00 ---- 0.00 7.41 304 12.88
11/03 19:00 ---- 0.00 7.51 347 12.65
11/03 20:00 ---- 0.00 7.65 408 12.51
11/03 21:00 ---- 0.00 7.86 498 12.42
11/03 22:00 ---- 0.00 8.06 583 12.37
11/03 23:00 ---- ---- ---- ---- 12.33
Data processed at Mon 04Nov2024 05:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ANAD.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ANAD.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ANAD.Stage.Inst.1Hour.0.Ccp-Rev
ANAD.Flow.Inst.1Hour.0.Ccp-Rev
ANAD.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.