RDOO2: Fourche Maline, Red Oak

                                SHEF ID:       RDOO2     Fourche Maline near Red Oak, OK
STATION TYPE:
Regulating: Stage = 15.00, Flow = 2941

PRECIP STAGE STAGE(2) RIV-FLOW VOLTAGE BAT-LOAD
in ft ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
05/14 00:00 0.00 3.44 ---- 119 12.89 ----
05/14 01:00 0.00 3.49 ---- 126 12.88 ----
05/14 02:00 0.00 3.52 ---- 131 12.86 ----
05/14 03:00 0.00 3.56 ---- 136 12.85 ----
05/14 04:00 0.00 3.60 ---- 142 12.84 ----
05/14 05:00 0.00 3.62 ---- 145 12.83 ----
05/14 06:00 0.00 3.62 ---- 145 12.82 ----
05/14 07:00 0.00 3.61 ---- 144 12.79 ----
05/14 08:00 ---- 3.59 ---- 141 ---- ----
05/14 09:00 ---- 3.58 ---- 139 ---- ----
05/14 10:00 ---- 3.56 ---- 136 13.91 ----
05/14 11:00 ---- ---- ---- ---- ---- ----
05/14 12:00 ---- 3.53 ---- 132 14.20 ----
05/14 13:00 0.00 3.52 ---- 131 13.60 ----
05/14 14:00 0.00 3.51 ---- 129 13.80 ----
05/14 15:00 0.00 3.49 ---- 126 13.76 ----
05/14 16:00 0.00 3.48 ---- 125 14.14 ----
05/14 17:00 0.00 3.47 ---- 123 13.66 ----
05/14 18:00 0.00 3.47 ---- 123 13.56 ----
05/14 19:00 ---- ---- ---- ---- ---- ----
05/14 20:00 ---- ---- ---- ---- ---- ----
05/14 21:00 ---- ---- ---- ---- ---- ----
05/14 22:00 ---- ---- ---- ---- ---- ----
05/14 23:00 ---- ---- ---- ---- ---- ----
Data processed at Tue 14May2024 23:33 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
REDO.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
REDO.Stage.Inst.1Hour.0.Ccp-Rev
REDO.Stage-Alt.Inst.1Hour.0.Ccp-Rev
REDO.Flow.Inst.1Hour.0.Ccp-Rev
REDO.Volt-Battery.Inst.1Hour.0.Ccp-Rev
REDO.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.