SVPL1: Red River at Shreveport Site 2

                                SHEF ID:       SVPL1     Red River at Shreveport Site 2
STATION TYPE:

PRECIP STAGE RIV-FLOW VOLTAGE
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
03/30 00:00 0.00 24.27 72160 12.82
03/30 01:00 0.00 24.24 71920 12.80
03/30 02:00 0.00 24.20 71600 12.79
03/30 03:00 0.00 24.19 71520 12.77
03/30 04:00 0.00 24.20 71600 12.77
03/30 05:00 0.00 24.14 71120 12.76
03/30 06:00 0.00 24.16 71280 12.76
03/30 07:00 0.00 24.10 70800 12.84
03/30 08:00 0.00 24.11 70880 13.32
03/30 09:00 0.00 24.07 70560 13.57
03/30 10:00 0.00 23.92 69360 13.89
03/30 11:00 0.00 23.93 69440 13.08
03/30 12:00 0.00 23.94 69520 13.37
03/30 13:00 0.00 23.83 68640 13.40
03/30 14:00 0.00 23.86 68880 13.34
03/30 15:00 0.00 23.94 69520 13.27
03/30 16:00 0.00 23.90 69200 13.22
03/30 17:00 0.00 23.85 68800 13.17
03/30 18:00 0.00 23.79 68320 13.09
03/30 19:00 0.00 23.77 68160 13.03
03/30 20:00 0.00 23.72 67760 13.00
03/30 21:00 0.00 23.68 67440 12.99
03/30 22:00 0.00 23.63 67040 12.97
03/30 23:00 0.00 23.68 67440 12.99
Data processed at Sun 31Mar2024 04:24 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
SHRE.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
SHRE.Stage.Inst.1Hour.0.Ccp-Rev
SHRE.Flow.Inst.1Hour.0.Ccp-Rev
SHRE.Volt-Battery.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.