BBRO2: Mountain Fork, Broken Bow Rereg

                                SHEF ID:       BBRO2     Mountain Fork Re-regulation Dam
STATION TYPE:

STAGE RIV-FLOW VOLTAGE BAT-LOAD
ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
03/27 00:00 394.44 2534 13.22 12.67
03/27 01:00 393.84 2207 13.20 12.67
03/27 02:00 393.30 1891 13.19 12.67
03/27 03:00 392.82 1650 13.22 12.67
03/27 04:00 392.37 1454 13.20 12.67
03/27 05:00 392.79 1636 13.20 12.67
03/27 06:00 394.72 2687 13.21 12.67
03/27 07:00 396.28 3527 13.17 12.67
03/27 08:00 397.57 4064 13.20 12.67
03/27 09:00 398.66 4700 13.21 12.66
03/27 10:00 399.32 6633 13.21 12.64
03/27 11:00 398.67 4721 13.20 12.62
03/27 12:00 397.64 4090 13.21 12.61
03/27 13:00 396.71 3722 13.22 12.61
03/27 14:00 395.92 3357 13.22 12.60
03/27 15:00 395.16 2932 13.22 12.61
03/27 16:00 394.47 2550 13.19 12.63
03/27 17:00 393.84 2207 13.22 12.63
03/27 18:00 393.27 1875 13.22 12.63
03/27 19:00 392.80 1640 13.22 12.63
03/27 20:00 393.20 1837 13.19 12.63
03/27 21:00 394.47 2550 13.20 12.64
03/27 22:00 394.48 2555 13.21 12.65
03/27 23:00 393.89 2238 13.21 12.66
Data processed at Thu 28Mar2024 04:34 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
BROM.Stage.Inst.1Hour.0.Ccp-Rev
BROM.Flow.Inst.1Hour.0.Ccp-Rev
BROM.Volt-Battery.Inst.1Hour.0.Ccp-Rev
BROM.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.